Hamburger Menu to X
Schedule your FREE,
no-obligation case review

Efficiency and Justice: A $96,054 Victory for an Electrical Installation Worker

In the high-stakes world of electrical installations, a hand or arm injury can instantly halt a career. For the client, a 43-year-old father of three, a December 2022 workplace accident could have spelled financial disaster. However, through swift legal action and precise negotiation, we secured a $96,054.00 global settlement and ensured he received over $1,400 per week during his recovery, allowing him to return to work with his finances and health intact.
man in brown and white plaid dress shirt and yellow hard hat holding black and orange

In this case result

The Incident: A Critical Injury on the Job

In December 2022, the client was performing his duties in the construction and electrical installation sector in Chicago, IL. While under the control of his employer, he suffered a significant injury to his right hand and arm.

Electrical and construction work requires extreme manual dexterity and strength. Any trauma to the hand or arm—ranging from severe lacerations to nerve compression or ligament damage—requires immediate and specialized medical attention to ensure a full return to function.

Strategy: Seamless Recovery and Maximum Benefits

Led by Jack Epstein, with 30 years of experience in the Illinois legal market, the firm’s strategy focused on “Efficiency and Full Wage Protection.” Unlike many cases that face years of insurance denials, we ensured that the client’s benefits flowed without interruption.

Our Strategic Interventions:

  1. Wage Replacement (TTD): We secured 36 weeks of Temporary Total Disability (TTD) benefits, paid at a high rate of $1,423.02 per week. This provided the client with over $51,000 in tax-free income while he was unable to work, protecting his wife and three children.
  2. Medical Continuity: We coordinated with the employer’s insurer to ensure all medical expenses were covered from the date of the injury through his final clearance, preventing any out-of-pocket costs or collection notices.
  3. Global Negotiation: Once the client reached maximum medical improvement, we negotiated a lump-sum settlement that accounted for the permanent nature of his injury, even as he prepared to return to his regular job.

A $96,054.00 Result for a Stable Future

By September 2023, the client was able to return to his regular electrical installation duties. Shortly thereafter, the Illinois Workers’ Compensation Commission formally approved the final settlement.

The $96,054.00 global settlement, added to the $51,228.72 in weekly benefits already paid, brought the total value of the client’s recovery to over $147,000.00. After legal fees and costs, the client received a net award of $76,648.21.

Proven Experience in Every Illinois Case

“Jack Epstein, with 30 years of experience in the Illinois legal market, personally oversaw the case.” “The client paid nothing until we won the case.”

The Final Word on Success

A workplace injury doesn’t have to be a legal nightmare. the client proved that with the right legal team, a case can be resolved efficiently, putting a six-figure sum into the worker’s pocket without prolonged litigation. By securing this $96,054 recovery, we ensured this father of three could get back to work with the financial security his family deserves.

Our goal is to support you
We want to hear from you.

Get in touch